Direct Answer
2-Layer FR4 PCB Cost Reference is a reference-only draft. The cost and lead-time ranges are intentionally withheld until price source review and commercial review are complete.
Reference ranges are planning aids only. Omini confirms real PCB or PCBA pricing only after reviewing Gerber or ODB++, stackup, BOM, centroid, assembly drawings, inspection scope, test requirements, quantity, lead time, packaging, and shipping assumptions.
Reference Scope
2-layer FR4, HASL lead-free or OSP, 50-100 x 50-100 mm, 10-100 units, bare_pcb, standard lead-time profile.
This page does not replace a formal RFQ and cannot be used as a purchase order price.
Reference Range Status
- Typical cost range: withheld pending source review: Requires approved quote statistics or benchmark source before publication.
- Lead-time range: withheld pending source review: Requires approved production lead-time source before publication.
- Confidence: low (0.2). Structure and assumptions are defined, but numeric ranges are blocked until source review.
- Last reviewed: 2026-08-03. Next review due: 2026-11-03.
Cost Drivers
- Layer count: 2 layers changes lamination, drilling, test, and yield assumptions.
- Material and finish: FR4 with HASL lead-free or OSP changes laminate sourcing, solderability, surface flatness, and storage assumptions.
- Board size and quantity: 50-100 x 50-100 mm at 10-100 units changes panel utilization, setup allocation, and handling cost.
- Assembly scope: bare_pcb controls whether stencil, placement, inspection, BOM handling, programming, or functional test can affect the reference range.
Lead Time Drivers
- Source review must separate normal fabrication or assembly time from material sourcing, component lead time, fixture readiness, inspection depth, documentation, packaging, and shipping.
- The current lead-time profile is standard; expedited handling must stay outside this reference until a formal RFQ confirms capacity and material availability.
- Blocked records keep lead-time ranges withheld so the draft cannot be mistaken for a delivery promise.
Manufacturing Notes
- Panel utilization and drill count can matter more than raw board area at low quantity.
- Finish choice should stay tied to assembly and shelf-life assumptions.
Tolerance Notes
- Assumes standard fabrication tolerances, not controlled impedance or unusually tight routing.
- Finished copper, outline, and hole tolerances must come from released fabrication notes.
Assumptions
- Bare PCB only; no component sourcing, assembly, programming, or functional test.
- No controlled impedance, blind vias, buried vias, via-in-pad, heavy copper, or special laminate.
- Numeric cost and lead-time ranges are withheld until source review.
When To Request Formal Quote
Request a formal RFQ when the released package is specific enough for manufacturing review: Gerber or ODB++, stackup, drill files, BOM, centroid, assembly drawing, quantity, lead time, inspection scope, test plan, packaging, and shipping assumptions. This page should help the buyer understand what changes the range, not replace the quote process.
Source Notes
- Existing OminiPCB repository content (internal): May seed structure and internal links; engineering claims still need external verification when specifications are involved.
- Public research required before generation (research_placeholder): Blocks publication until replaced by specific trusted sources.
Data provenance: pending_source_review; schema_seed_not_market_data. Customer data stored: false.
CTA
Request a PCB quote when the manufacturing files and quote assumptions are ready for engineering review.
RFQ Readiness Guide
The purpose of 2-Layer FR4 PCB Cost Reference is to make a manufacturing decision possible before a supplier spends time interpreting missing information. An RFQ is useful when two suppliers can price the same technical scope. If each supplier fills in different assumptions, the prices are not comparable and the delivery promise is not meaningful.
Minimum Data Set
1. Board name, revision, quantity by build stage, target date, and shipping destination. 2. Fabrication files, finished dimensions, layer count, thickness, copper weights, material family, surface finish, and impedance requirements. 3. Assembly BOM with manufacturer part numbers, approved alternates, customer-supplied parts, DNI items, and lifecycle concerns. 4. Assembly drawing, centroid data, polarity and orientation rules, panelization assumptions, and special process notes. 5. Inspection, electrical test, programming, calibration, serialization, coating, cleaning, and packaging requirements. 6. Commercial boundaries: tooling, NRE, setup, MOQ, split shipments, material ownership, and change-order treatment.
Assumption Register
Ask the supplier to return a short assumption register with the quote. It should list missing files, ambiguous part numbers, substitutions, stock risks, panel assumptions, test coverage, and any requirement that was not included in the price. This converts hidden uncertainty into a reviewable engineering list.
Quote-Comparison Table
Compare suppliers on the same columns: material and finish, board class, copper and thickness, assembly quantity, component sourcing model, inspection scope, test coverage, tooling, NRE, lead time, yield or rework assumptions, packaging, and validity period. A low unit price can be caused by omitted test, an unapproved alternate, or a lead time that begins only after material arrival.
Change Control
Before award, define which changes need buyer approval. Typical examples include laminate family, surface finish, component manufacturer, date code, solder alloy, reflow profile limits, test program, and packaging. Keep the RFQ package revision-controlled so that a later quote can be compared with the original scope.
FAQ
Can a Gerber file alone support an assembly quote?
No. Assembly also requires BOM, placement data, assembly drawing, sourcing assumptions, and the required inspection and test scope.
Why do quotes differ so much?
Suppliers may be pricing different materials, alternates, panel utilization, test levels, tooling, freight assumptions, or schedule definitions.
What is the best next step after receiving quotes?
Normalize the assumptions first, then ask targeted clarification questions before comparing price or selecting a supplier.
